Planning shifts in a 36-hour cyclical roster / Richard Freling, Nanda Piersma and Albert P.M. Wagelmans
| rdfs:label | "Planning shifts in a 36-hour cyclical roster / Richard Freling, Nanda Piersma and Albert P.M. Wagelmans" |
| schema:name | "Planning shifts in a 36-hour cyclical roster" |
| schema:author | Freling, Richard (1967-2002) |
| Econometric Institute (Rotterdam) | |
| schema:contributor | Wagelmans, Albert Peter Marie (1960-) |
| Piersma, Nanda | |
|
schema:same |
<http:/ |
|
schema:main |
<https:/ |
|
http:/ |
"1997" |
| schema:about |
<http:/ |
| Operations research | |
| ploegenarbeid | |
| Ploegenstelsel | |
| Arbeidstijd | |
| werktijden | |
|
schema:in |
"en" |
|
schema:is |
Report / Econometric Institute, Erasmus University Rotterdam |
|
schema:number |
8 |
| schema:publication |
<https:/ |